Ok, it's been a while. Things are moving along with the new home, still praying for the current home to get sold, we had a buyer and he went through all the steps and in the end couldn't close so now our home is back on the market, but we Trust in the Lord with all thine heart and we are leaning NOT to our own understanding, we know that God has gotten us this far and he will guide us and take us the rest of the way. Therefore, we had our pre-drywall meeting and below I took some pictures of the things they've done.
|
You can see that the electricians have everything marked correctly, looking closely you can see some of the scriptures that we wrote on the frames. |
|
This is the family room, you can see the drywall sitting waiting and the insulation installed. |
|
In the morning room, the connections you see are to the sink in the kitchen. |
|
My hubby and our PM, looking at the placement of the recessed lights, my hubby don't play. LOL |
|
This is the area for the refridgerator hook up.
|
|
Stairs coming into the basement, light fixture on the wall at the bottom of the stairs. |
|
2 electrical boxes, we have one for the upstairs he said and one for the first floor and basement.
|
It looks like everything is moving smoothly, stay tuned, brick and the actual drywall should be up soon.
Be Blessed!!